PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Compactig soil at foundation walls Facing East c.l. 2.5 (800x600).jpg Lifting Slip forms at Elev. 4-Stair -2 to 3rd floor Facing South (800x600).jpg Lifting Slip forms at Elev. 5,6 to 3rd floor Facing South (800x600).jpg Lifting Slip forms at Elev. 1,2,3 to 3rd floor Facing South (800x600).jpg Lifting the slip forms at Elev. 4,5 3rd floor Facing South-East (800x600).jpg
Next page Compactig soil at foundation walls Facing East c.l. 2.5 (800x600)
Compactig soil at foundation walls Facing East c.l. 2.5 (800x600)